Every authorized BESS in Italy, with its decree.
Battery storage projects authorized by MASE and Regione Siciliana. Each value is read from the official act and linked to it.
- Authorized projects
- 229
- GW authorized
- 21.8
- Regions
- 18
Free preview: 192 projects authorized through 17 Aug 2026.
Free preview and subscription
| Free preview | Subscribers | |
|---|---|---|
| Projects on the map | 192, authorized through 17 Aug 2026 | All 229, through 16 Oct 2026 |
| Authorizations of the last 60 days | Count only: 37 projects, 4.4 GW | Full records, marked as new |
| FER X layer | Not included | 591 plants admitted to the GSE FER X transitional auction |
| Regional authorizations layer | Not included | 1 regional single authorization of 10 MW or more |
| Municipal PAS layer | Not included | 4 municipal simplified authorizations (PAS) of 10 MW or more, 91.4 MW in total, from regional bulletins |
| Pipeline layer | Not included | 14 storage projects in permitting, not authorized, 0.46 GW in total, from the MASE report on authorization procedures and the official bulletin of Regione Emilia-Romagna |
| Export | Not included | CSV and XLSX, with issuing body and source notes |
| Access | One 30-minute session per email address | Personal sign-in link |
| Updates | 60 days behind the data | Monthly |
Method & sources
Every value comes from an official act. Each project links to the act that authorizes it.
- MASE
- Directorial decrees of single authorization for electricity generation, storage technology. Where a value is stated only in the decree’s preamble, the record says so.
- Regione Siciliana
- Single authorizations (D.D.G. and D.R.S.) of the Department of Energy. In Sicily the single authorization is a regional competence.
- GSE
- FER X transitional auction rankings of 1 and 10 December 2025 (NZIA). A subscriber layer, kept out of the BESS totals.
- Regional bulletins
- BUR Puglia, BURERT Emilia-Romagna, BUR Veneto, BURAS Sardegna, GURS Sicilia, BURA Abruzzo, BUR Friuli Venezia Giulia, BURC Calabria, BURM Molise, BURL Lombardia, BUR Piemonte, BUR Lazio, BURT Toscana, BURL Liguria, BUR Marche, BUR Umbria and BURC Campania. PAS notices published under art. 8 c. 9 D.Lgs. 190/2024. Values are read from the notice, and each record links to it. Projects with doubts are held back until checked. A subscriber layer, kept out of the BESS totals.
- Amendments update the original project and transfers update the holder. Neither counts as a new project.
- Links to the acts are checked before each update.
- Locations are geocoded at municipality level.
- This edition: 229 projects, 21,819 MW. Data retrieved 16 Oct 2026, decrees through 16 October 2026. Subscribers get a monthly update.
One record, with its source
- Project
- GALATINA 1
- Company
- LIGHTSOURCE RENEWABLE ENERGY ITALY SPV 20 S.R.L.
- Municipality (Prov)
- Galatina (LE)
- Region
- Puglia
- Power
- 100 MW
- Energy
- 800 MWh
Source: MASE decree 157, 24 Jun 2026